Projects - Latvia

Energy Efficiency in permitting and inspections, phase 3

  • Number: 2012/04
  • Status: Running
  • Period: 2012
In part 2 of the IMPEL project: “Energy Efficiency in Permitting and Inspection,” the project team consisting of 6 representatives from 5 IMPEL Member States and the consultant made an analysis of major changes from IPPC to Industrial Emissions Directive (IED), discussed the new BAT concept under IED and identified relevant IED provisions related to energy efficiency. They: -          identified the basic documents to be reviewed during the project, -          decided...
Read more
  • Lead Country:
  • Germany

Waste Sites, phase 2

  • Number: 2012/18
  • Status: Running
  • Period: 2012
Under Article 34(1) of Directive 2008/98/EC on waste, establishments or undertakings which carry out waste treatment operations, establishments or undertakings which collect or transport waste on a professional basis, brokers and dealers, and establishments or undertakings which produce hazardous waste shall be subject to appropriate periodic inspections by the competent authorities. Recent discussions in IMPEL-TFS and among high-level inspectors have addressed, among other things, the necessity...
Read more
  • Lead Country:
  • Germany

IMPEL TFS Conference 2012

  • Number: 2012/13
  • Status: Running
  • Period: 2012
The projects and activities of IMPEL Cluster 2 are based on the European Waste Shipment Regulation Nº 1013/2006. Being a Regulation and including a cross-border aspect, it is of high importance to have an active and practical European network of inspectors and regulators that meet on a regular basis to exchange practical experiences. Not only environmental inspectors, but also Customs and Police officers and the Judiciary. Ongoing IMPEL-TFS projects continue to show the need for establishing and...
Read more
  • Lead Country:
  • Cluster 2 Secretariat and UK

IMPEL TFS Enforcement Actions III

  • Number: 2012/15
  • Status: Running
  • Period: 2012
This project will run until the spring of 2014 and will encourage best practice in waste shipment inspections through a series of coordinated inspections and exchanges.  The inspections under this project will take place during three periods in both 2012 and 2013.  A ‘chain’ (from site of loading to site of recovery) approach to inspection will be used to verify environmentally sound management of waste shipments. Enforcement tools will also be developed as part of this project to encourage...
Read more
  • Lead Country:
  • UK

Enforcement Actions Interim Project

  • Number: 2011/25
  • Status: Finalised
  • Period: 2011
The Waste Shipment Regulation (1013/2006/EC) requires Member States to inspect shipments of waste and to co-operate with each other. The Enforcement Actions project was set up for the following reasons: - Some Member States expressed the need for a formalised project framework in order to integrate this with the enforcement inspections in their own countries; - International cooperation is essential to tackle international environmental problems; and - The network of enforcers in the field...
Read more
  • Lead Country:
  • UK (Scotland)

8th General Assembly

[ November 24, 2011 to November 25, 2011. ] The 8th IMPEL General Assembly will take place in Warsaw, Poland between the 24-25 November 2011. Novotel Centrum Warszawa 94/98 Marszałkowska Street Warsaw

Cluster 1 meeting

[ March 24, 2011 to March 25, 2011. ] IMPEL’s Cluster 1 will meet in Budapest on March 24/25 2011.

Energy efficiency in permitting and inspections

  • Number: 2010/05
  • Status: Finalised
  • Period: 2010
The main objectives of the project were:
  • to explore how member states have implemented in practice the energy efficiency provisions of the IPPC directive and handle obstacles
  • to identify how member states enforce their legal  requirements in this field
  • to find out what kind of information is required in permit applications e.g. energy efficiency indicators
  • to analyse how member states work with the BREF Energy Efficiency and information of other BREFs...

Read more
  • Lead Country:
  • Germany

Energy efficiency in permitting and inspections, phase 2

  • Number: 2011/06
  • Status: Running
  • Period: 2011
Energy is a priority issue within the European Union. The EU Climate change and Energy Package forsees an increase in energy efficiency of 20 % and a reduction of greenhouse gases by 20 % till 2020. In 2002/2003 IMPEL has carried out a project on energy efficiency with Finland as lead country. A second project on that item was carried out in 2010 and the evaluation of the current situation showed that during the last years only minor changes have occurred in the consideration of energy efficiency...
Read more
  • Lead Country:
  • Germany

Strategies of Enforcement

  • Number: 2011/12
  • Status: Finalised
  • Period: 2011
Enforcement is the tool that the authorities can use to achieve compliance with the regulation. Compliance with the legal requirements is an essential foundation for environmental protection. Without compliance, environmental requirements will not achieve the desired results. Enforcement is an important action second to regulation, inspection and identification of non-compliance. This project can be considered as a continuation of previous IMPEL projects like: Review of Compliance promotion, Inspections...
Read more
  • Lead Country: